Sequence
of Operations:
• Operator scans model number
• Computer retrieves test procedure by model
(fixture, flow rate, purge time)
• Computer executes test procedure
• Prompts operator to pick up fixture
• Verifies correct fixture
• Verifies fixture is connected to coil (using
ground clip)
• Begins nitrogen purge
• Monitors nitrogen flow rate
• Records nitrogen purge data to database
by serial number
• Records pass/fail status to PackOut™
database—prohibits cycling at subsequent IPCS
modules until passed (for example, PressureCheck™
or LeakProof™) |